en
EN
RU
Home
About us
Projects in CA
Kazakhstan
Kyrgyzstan
Tajikistan
Turkmenistan
Uzbekistan
Sez
Kazakhstan
Kyrgyzstan
Tajikistan
Turkmenistan
Uzbekistan
FTA
Official documents
Media
Follow us on
© 2019 All rights reserved
Home
About us
Projects in CA
Kazakhstan
Kyrgyzstan
Tajikistan
Turkmenistan
Uzbekistan
Sez
Kazakhstan
Kyrgyzstan
Tajikistan
Turkmenistan
Uzbekistan
FTA
Official documents
Media
en
EN
RU
Kyrgyzstan
About Kyrgyzstan
Projects
Challenges and Contributions
Sector
All
Agriculture and Food Processing
Energy
Industrial
Industry
Infrastructure
Mineral and petroleum exploration, extraction and processing
Rail and Road Connectivity
Show
Map
List
- Alternative North-South Road (Phase 1)
- Alternative North-South Road (Phase 1)
- Alternative North-South Road (Phase 2)
- Alternative North-South Road (Phase 3)
- Cement Plant
- Cement Plant
- Construction of the China - Central Asia Gas Pipeline - Kyrgyzstan Section
- Datka-Kemin Power Transmission Line
- Development of the Road Network in Bishkek (1st phase)
- Development of the Road Network in Bishkek (2nd phase)
- Ishtamberdy gold mining and processing plant
- Kyrgyzstan portion in Turkmenistan-China gas pipeline, Line D
- Modernisation of Datka - South Power Transmission Lines
- Modernisation of the Thermal Power Plant
- Modernization of the state “Central Laboratory”
- Production of household appliances
- Reconstruction and Rehabilitation of Municipal Roads
- Reconstruction of the Irrigation System of Kyrgyzstan
- Reconstruction of the Irrigation System of Kyrgyzstan
- Reconstruction of the Issyk-Kul ring road
- Rehabilitation of the Bishkek-Balykchy highway, kms 147-171
- Rehabilitation of the Bishkek-Naryn-Torugart Highway
- Rehabilitation of the Osh-Batken-Isfana Highway, km 220-232, 248-360
- Restoration of Highway Pavement in Bishkek
- Taldy-Bulak Levoberezhny Gold Mining Site
- The China-Kyrgyzstan-Uzbekistan Railway (CKU)
- Togolok gold mining site
- Tokmok Oil Refinery
- Zhongda Oil Refinery